DELL EMC D-PSC-MN-01 Practice Exams
Last updated on Apr 02,2025- Exam Code: D-PSC-MN-01
- Exam Name: Dell PowerScale Maintenance
- Certification Provider: DELL EMC
- Latest update: Apr 02,2025
What step should be performed when testing connectivity between a Dell EMC PowerScale cluster and an NFS client?
- A . Map a drive to the default IFS share on the cluster
- B . Ping the DNS server used by the cluster from PuTTY
- C . Create an NFS export and mount it on the NFS client
- D . In a Web browser, type the cluster name and press Enter
When testing connectivity to the Dell EMC PowerScale cluster through the Web Administration interface, what should be typed in the address line of the browser?
- A . https://<clustername>:8080
- B . http://<clustername>:80
- C . http://<clustername>:8082
- D . https://<clustername>:8081
When testing connectivity to the Dell EMC PowerScale cluster through the Web Administration interface, what should be typed in the address line of the browser?
- A . https://<clustername>:8080
- B . http://<clustername>:80
- C . http://<clustername>:8082
- D . https://<clustername>:8081
When testing connectivity to the Dell EMC PowerScale cluster through the Web Administration interface, what should be typed in the address line of the browser?
- A . https://<clustername>:8080
- B . http://<clustername>:80
- C . http://<clustername>:8082
- D . https://<clustername>:8081
A customer received replacement parts from Dell without prior communication.
Why did they receive the replacement parts?
- A . The cluster is configured with Secure Remote Services only.
- B . The cluster is enrolled in the AutoCRU program.
- C . The cluster is configured with SCG.
- D . The cluster is configured with SupportAssist only.
A platform engineer is creating a Dell PowerScale cluster that must meet SEC 17a-4f rules. Node 1 is powered on and cabled.
What action must be taken to meet the requirement?
- A . Create a cluster.
- B . Reboot into SmartLock Compliance mode.
- C . Activate the Enterprise Security mode license.
- D . Call Dell Tech Support to configure the cluster manually.
A platform engineer is creating a Dell PowerScale cluster that must meet SEC 17a-4f rules. Node 1 is powered on and cabled.
What action must be taken to meet the requirement?
- A . Create a cluster.
- B . Reboot into SmartLock Compliance mode.
- C . Activate the Enterprise Security mode license.
- D . Call Dell Tech Support to configure the cluster manually.
What is the required minimum number of PowerScale P100 and Bl 00 Accelerator nodes to add to a PowerScale cluster?
- A . 2
- B . 4
- C . 1
- D . 3
What is a precaution when working with Dell EMC PowerScale equipment?
- A . Nodes can operate above 40 degrees C, but only for limited periods of time.
- B . Connections to the branch circuit need not be properly grounded.
- C . Use side stabilizers if the rack is not securely bolted to the floor.
- D . The total rack load should not exceed 70% of the branch circuit rating.
What is a precaution when working with Dell EMC PowerScale equipment?
- A . Nodes can operate above 40 degrees C, but only for limited periods of time.
- B . Connections to the branch circuit need not be properly grounded.
- C . Use side stabilizers if the rack is not securely bolted to the floor.
- D . The total rack load should not exceed 70% of the branch circuit rating.