You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3 rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non Conformance Report (NCR) he has written for a NACE2/SSPC SP 10 centrifugal blast which you had previously approved.
Your FIRST preferred course of action is to:
- A . Verbally challenge the NCR
- B . Request a re-blast of the item in question
- C . Consult your supervisor
- D . Review the NCR with the other Inspector
NACE/SSPC Water Jetting standards are directly equivalent to ISO Abrasive Blast Standards:
- A . True
- B . False
Corrosion is the reverse process of
- A . hot dipping.
- B . steel manufacturing.
- C . flaking.
- D . galvanic deterioration.
Dehumidification is defined as the removal of moisture vapor from the air to
- A . provide worker comfort.
- B . lower its temperature
- C . raise its relative humidity.
- D . lower its dew point,
Surface preparation of concrete is performed using:
- A . Methods that are exactly the same as steel
- B . Methods that are completely different to steel
- C . Methods that have been modified for concrete
- D . Methods that are the same as wood
The cost of qualified Coating Inspection is normally offset by:
- A . Lower Application Costs
- B . Lower Coating Life Cycle Costs
- C . Lower Safety Enforcement Costs
- D . Lower Supervision Costs
Application of Thermal Spray Coatings requires:
- A . The same skills as liquid coatings
- B . Specialized skills supported by training and experience
- C . No particular skills
- D . The same skills as welding
Thermal Spray coatings provide:
- A . Barrier protection
- B . Inhibitive protection
- C . Sacrificial protection
- D . Thermal protection
An Inspection and Test Plan is required when:
- A . It is always required
- B . When the Coating Applicator requests one
- C . When the Owner specifies one
- D . When the Inspector requests one
NACE Standards include:
- A . Standard Practices
- B . Material Requirements
- C . a) & b)
- D . a) only